Jump to content

Franz Karl

BFE Members
  • Content Count

    25
  • Joined

  • Last visited

Everything posted by Franz Karl

  1. Le Havre, 25/042021 - Le Havre, Normandy, France. Siemens Gamesa has received the firm order for the supply of wind turbines and a 15-year maintenance contract for the Fécamp offshore wind power plant from customer EDF Renewables, Enbridge and wpd. This 497 MW project located in Normandy will be equipped with 71 SWT-7.0-154 offshore wind turbines, each with capacity of 7 MW. These turbines will be manufactured in the new wind turbine plant Siemens Gamesa is actually building in Le Havre, France.
  2. Franz Karl

    PONT-AVEN

    Le Havre, 25/042021
  3. Franz Karl

    PONT-AVEN

    Le Havre, 25/042021
  4. Le Havre Canal Bossière 20/02/2021

    © fgolhen

  5. Franz Karl

    Cap Finistère

    Le Havre, Canal Bossière 20/02/2021

    © fgolhen

  6. 01/01/2021
  7. 01/01/2021
  8. 01/01/2021
  9. Franz Karl

    BRETAGNE

    Le Havre TGB3 16/07/2020
  10. Franz Karl

    BRETAGNE

    Le Havre TGB3 16/07/2020
  11. Franz Karl

    BRETAGNE

    Le Havre TGB3 16/07/2020
  12. Franz Karl

    BRETAGNE

    Le Havre TGB3 16/07/2020
  13. Franz Karl

    BRETAGNE

    Le Havre TGB3 16/07/2020
  14. Franz Karl

    CONNEMARA

    Le Havre 15th July 2020
  15. Le Havre 27/06/2020
  16. Le Havre, France 17/05/2020. My first walk in the port since two months. Feels so good, great sunshine but sorry to see the 5 vessels of Brittany Ferries still here for so long. Hopefully they will set sail very soon to the open sea! More pics of the 5 https://www.flickr.com/photos/lehavre-ships/
  17. Le Havre, France 17/05/2020. My first walk in the port since two months. Feels so good, great sunshine but sorry to see the 5 vessels of Brittany Ferries still here for so long. Hopefully they will set sail very soon to the open sea! More pics of the 5 https://www.flickr.com/photos/lehavre-ships/
×
×
  • Create New...